{"id":594,"date":"2022-05-19T17:39:06","date_gmt":"2022-05-19T17:39:06","guid":{"rendered":"https:\/\/safespan.com\/blog\/?p=594"},"modified":"2022-05-19T20:39:50","modified_gmt":"2022-05-19T20:39:50","slug":"higgins-avenue-bridge","status":"publish","type":"post","link":"https:\/\/safespan.com\/blog\/2022\/05\/19\/higgins-avenue-bridge\/","title":{"rendered":"Higgins Avenue Bridge"},"content":{"rendered":"\n<p>Sletton Construction | Missoula, Montana<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"703\" src=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Higgins-Bridge-3-1024x703.jpg\" alt=\"\" class=\"wp-image-611\" srcset=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Higgins-Bridge-3-1024x703.jpg 1024w, https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Higgins-Bridge-3-980x673.jpg 980w, https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Higgins-Bridge-3-480x330.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><\/figure>\n\n\n\n<p><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Higgins-2-1-1024x768.jpg\" alt=\"\" class=\"wp-image-612\" title=\"IMG_7634\" srcset=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Higgins-2-1-1024x768.jpg 1024w, https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Higgins-2-1-980x735.jpg 980w, https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Higgins-2-1-480x360.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Safe Access &amp; Shielding<\/h3>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Rehabilitation of the Higgins Avenue Bridge was necessary to extend the life of the bridge. The structure had distress and deterioration issues on both top and bottom concrete decks.<br><br>Safespan was able to provide full access to the work area while completely shielding the under area of the structure to protect the Clark Ford River from demolition, debris, and other hazardous material.<br><br>Improvements made during the rehabilitation of the structure included; replacing \/ widening the concrete decks, steel structures, and coating the entire steel portion of the bridge with new protective paint.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Our patented platform system spanned a total of&nbsp;<strong>31,595 sq. ft.<\/strong>&nbsp;before widening to<br><strong>36,935 sq. ft<\/strong>.&nbsp;The components were custom designed by our in-house structural engineering staff to meet the project requirements.<br><br>The Higgins Avenue Bridge is now accommodating and safe for vehicle, pedestrian, and bicycle use.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<blockquote class=\"wp-block-quote is-layout-flow wp-block-quote-is-layout-flow\"><p><strong>&#8220;With these good bones and careful rehabilitation of the structure, the bridge will serve the Missoula community for years to come.&#8221;<\/strong>&#8211;<a rel=\"noreferrer noopener\" href=\"https:\/\/www.mdt.mt.gov\/pubinvolve\/higginsbridge\/faqs.shtml\" target=\"_blank\">Montana&#8217;s Official State Website<\/a><\/p><p><\/p><\/blockquote>\n","protected":false},"excerpt":{"rendered":"<p>Sletton Construction | Missoula, Montana Safe Access &amp; Shielding Rehabilitation of the Higgins Avenue Bridge was necessary to extend the life of the bridge. The structure had distress and deterioration issues on both top and bottom concrete decks.Safespan was able to provide full access to the work area while completely shielding the under area of [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":611,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"on","_et_pb_old_content":"<!-- wp:table -->\n<figure class=\"wp-block-table\"><table><tbody><tr><td> We would like to thank <strong>Sletten Construction Company<\/strong> for allowing Safespan Platform Systems, Inc to be their access and shielding supplier on the\u00a0<strong>Higgins Avenue Bridge<\/strong> in <strong>Missoula, Montana.<\/strong><\/td><\/tr><\/tbody><\/table><\/figure>\n<!-- \/wp:table -->\n\n<!-- wp:table -->\n<figure class=\"wp-block-table\"><table><tbody><tr><td>Rehabilitation of the Higgins Avenue Bridge was necessary to extend the life of the bridge. The structure had distress and deterioration issues on both top and bottom concrete decks.<br><br>Safespan was able to provide full access to the work area while completely shielding the under area of the structure to protect the Clark Ford River from demolition, debris, and other hazardous material.<br><br> Improvements made during the rehabilitation of the structure included; replacing \/ widening the concrete decks, steel structures, and coating the entire steel portion of the bridge with new protective paint. <br><br> Our patented platform system spanned a total of&nbsp;<strong>31,595 sq. ft.<\/strong>&nbsp;before widening to<strong>36,935 sq. ft<\/strong>.&nbsp;The components were custom designed by our in-house structural engineering staff to meet the project requirements.<br>The Higgins Avenu <\/td><\/tr><\/tbody><\/table><\/figure>\n<!-- \/wp:table -->","_et_gb_content_width":"","footnotes":""},"categories":[3],"tags":[],"class_list":["post-594","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-project-month"],"acf":[],"_links":{"self":[{"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/posts\/594","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/comments?post=594"}],"version-history":[{"count":7,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/posts\/594\/revisions"}],"predecessor-version":[{"id":625,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/posts\/594\/revisions\/625"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/media\/611"}],"wp:attachment":[{"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/media?parent=594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/categories?post=594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/tags?post=594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}