{"id":618,"date":"2022-05-20T14:25:05","date_gmt":"2022-05-20T14:25:05","guid":{"rendered":"https:\/\/safespan.com\/blog\/?p=618"},"modified":"2022-05-20T14:27:55","modified_gmt":"2022-05-20T14:27:55","slug":"ogdensburg-bridge","status":"publish","type":"post","link":"https:\/\/safespan.com\/blog\/2022\/05\/20\/ogdensburg-bridge\/","title":{"rendered":"Ogdensburg Bridge"},"content":{"rendered":"\n<p>Piasecki Steel Construction Corp. | New York <\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"621\" src=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Ogensburg-1-1024x768.jpg\" alt=\"\" class=\"wp-image-621\" srcset=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Ogensburg-1-980x735.jpg 980w, https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Ogensburg-1-480x360.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><figcaption>default<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<p>Safespan would like to acknowledge the professional and impressive platform installation performed by&nbsp;<a rel=\"noreferrer noopener\" href=\"https:\/\/piaseckisteel.com\/\" target=\"_blank\">Piasecki Steel<\/a><strong>&nbsp;<\/strong>on the Odgensburg- Prescott International Bridge in New York.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Odensburg-bridge-1-1024x576.jpg\" alt=\"\" class=\"wp-image-620\" title=\"IMG_7634\" srcset=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Odensburg-bridge-1-980x551.jpg 980w, https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Odensburg-bridge-1-480x270.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\">Safe Access &amp; Shielding Above the St. Lawrence River<\/h3>\n\n\n\n<p>Over&nbsp;<strong>1,500 LF x 37&#8242;-8&#8243;<\/strong>&nbsp;of platform was installed beneath the curved bridge structure to facilitate the replacement of nearly 400 W -Shaped floor beams and&nbsp;<strong>50,000 sq.ft.<\/strong>&nbsp;of open steel bridge deck sections along the U.S. approach truss spans.<\/p>\n\n\n\n<p>Our patented platform system allowed access to&nbsp;<strong>100%<\/strong>&nbsp;of the bridge&#8217;s existing steel grid, bridge deck, and floor beam system; allowing Piasecki&#8217;s team to field verify the floor beam connections and the joint configurations.<\/p>\n\n\n\n<p><br>Nightly floor beam and bridge deck replacement required temporary detachment of our vertical tie-ups at the work location.Temporary loading conditions were developed to permit worker access during these nightly replacement operations without altering the planned replacement limits.<\/p>\n\n\n\n<h4 class=\"wp-block-heading\"><\/h4>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/ogensburg-4-1024x768.jpg\" alt=\"\" class=\"wp-image-622\" title=\"Snapshot_1\" srcset=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/ogensburg-4-980x735.jpg 980w, https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/ogensburg-4-480x360.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/><figcaption>The platform was installed through a curved portion of the structure. This required additional longitudinal cable sections, anchor point locations, and spreader tubes due to straight line pull limitations.<\/figcaption><\/figure>\n\n\n<p>[\/et_pb_text][\/et_pb_column]<br \/>[\/et_pb_row]<br \/>[\/et_pb_section]<\/p>","protected":false},"excerpt":{"rendered":"<p>Piasecki Steel Construction Corp. | New York default Safespan would like to acknowledge the professional and impressive platform installation performed by&nbsp;Piasecki Steel&nbsp;on the Odgensburg- Prescott International Bridge in New York. Safe Access &amp; Shielding Above the St. Lawrence River Over&nbsp;1,500 LF x 37&#8242;-8&#8243;&nbsp;of platform was installed beneath the curved bridge structure to facilitate the replacement [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_et_pb_use_builder":"on","_et_pb_old_content":"<!-- wp:paragraph -->\n<p>Piasecki Steel Construction Corp. | New York <\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:gallery {\"linkTo\":\"none\"} -->\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped\"><!-- wp:image {\"id\":621,\"sizeSlug\":\"large\",\"linkDestination\":\"none\"} -->\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Ogensburg-1-1024x768.jpg\" alt=\"\" class=\"wp-image-621\"\/><figcaption>default<\/figcaption><\/figure>\n<!-- \/wp:image --><\/figure>\n<!-- \/wp:gallery -->\n\n<!-- wp:paragraph -->\n<p>Safespan would like to acknowledge the professional and impressive platform installation performed by\u00a0<a rel=\"noreferrer noopener\" href=\"https:\/\/piaseckisteel.com\/\" target=\"_blank\">Piasecki Steel<\/a><strong>\u00a0<\/strong>on the Odgensburg- Prescott International Bridge in New York.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:image {\"id\":620,\"sizeSlug\":\"large\",\"linkDestination\":\"none\"} -->\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/Odensburg-bridge-1-1024x576.jpg\" alt=\"\" class=\"wp-image-620\" title=\"IMG_7634\"\/><\/figure>\n<!-- \/wp:image -->\n\n<!-- wp:heading {\"level\":3} -->\n<h3>Safe Access &amp; Shielding Above the St. Lawrence River<\/h3>\n<!-- \/wp:heading -->\n\n<!-- wp:paragraph -->\n<p>Over\u00a0<strong>1,500 LF x 37'-8\"<\/strong>\u00a0of platform was installed beneath the curved bridge structure to facilitate the replacement of nearly 400 W -Shaped floor beams and\u00a0<strong>50,000 sq.ft.<\/strong>\u00a0of open steel bridge deck sections along the U.S. approach truss spans.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p>Our patented platform system allowed access to\u00a0<strong>100%<\/strong>\u00a0of the bridge's existing steel grid, bridge deck, and floor beam system; allowing Piasecki's team to field verify the floor beam connections and the joint configurations.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:paragraph -->\n<p><br>Nightly floor beam and bridge deck replacement required temporary detachment of our vertical tie-ups at the work location.Temporary loading conditions were developed to permit worker access during these nightly replacement operations without altering the planned replacement limits.<\/p>\n<!-- \/wp:paragraph -->\n\n<!-- wp:heading {\"level\":4} -->\n<h4><\/h4>\n<!-- \/wp:heading -->\n\n<!-- wp:image {\"id\":622,\"sizeSlug\":\"large\",\"linkDestination\":\"none\"} -->\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/safespan.com\/blog\/wp-content\/uploads\/2022\/05\/ogensburg-4-1024x768.jpg\" alt=\"\" class=\"wp-image-622\" title=\"Snapshot_1\"\/><figcaption>The platform was installed through a curved portion of the structure. This required additional longitudinal cable sections, anchor point locations, and spreader tubes due to straight line pull limitations.<\/figcaption><\/figure>\n<!-- \/wp:image -->","_et_gb_content_width":"","footnotes":""},"categories":[3],"tags":[],"class_list":["post-618","post","type-post","status-publish","format-standard","hentry","category-project-month"],"acf":[],"_links":{"self":[{"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/posts\/618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/comments?post=618"}],"version-history":[{"count":4,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/posts\/618\/revisions"}],"predecessor-version":[{"id":640,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/posts\/618\/revisions\/640"}],"wp:attachment":[{"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/media?parent=618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/categories?post=618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/safespan.com\/blog\/wp-json\/wp\/v2\/tags?post=618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}