MOOG Water Tower
Safespan was able to design, deliver, and install a 130' high scaffold structure around the MOOG water tank using our Modular Scaffolding...
The Rockford
Rochester, New York Thank you Bace Build & Livingston Associates for giving Safespan the opportunity to provide safes access and support on this...
Tannersville Water Tower
Wolfe Builders, Inc. / Tannersville, New York Safespan provided full working access to this privately owned 80 foot tall - 100 year old...
New York State Museum
Thank you Kingsley Arms, Inc. for trusting Safespan to provide safe access and support on this urgent project in Albany, New York. After a large...
Castleton-On-Hudson Bridge
Lancaster Development / Albany, New York Rehabilitation of the Castleton- on-Hudson Bridge required 5,330 SF of our Multi- Span Platform System. Our...
Verizon Building
https://www.youtube.com/watch?v=ZcrNWGRmncg Safespan Scaffolding stepped up to a major undertaking at the exterior restoration of the Verizon...
Ogdensburg Bridge
Piasecki Steel Construction Corp. | New York default Safespan would like to acknowledge the professional and impressive platform installation...
Albright-Knox Art Gallery
Buffalo, New York Thank you Morris Masonry Restoration and Weaver Metal & Roofing for allowing Safespan to supply...
Higgins Avenue Bridge
Sletton Construction | Missoula, Montana Safe Access & Shielding Rehabilitation of the Higgins Avenue Bridge was necessary to extend the life of...
ICC
On behalf of Matt Eichen, Tony Frazzini, Russ Benning, Chet Phillips, Torri Griffm, Rob Brinkman and everyone at ICC, we want to thank you for...